We – EPG Team the bigge EPT Chain and agricultural gearbox factory in China with 5 different branches. For far more details: Cell/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778 0571 88828
Cooling Tower Enthusiast Abdominal muscles/ FRP/ Aluminium Alloy Substance
Abdominal muscles Cooling Tower Fan (NRT Series)
Product Info
Design: CFA
Brand: NEWIN
Content: ABS plastic
Cooling tower | Enthusiast blade size (mm) | Motor(kw)x shaft diameter(mm)x essential width(mm)x shaft duration(mm) |
8RT | 550 | .18kwx 18x 6.35x 55 |
10RT | 550 | .18kwx 18x 6.35x fifty five |
15RT | 640 | .37kwx 18x 6.35x 55 |
20RT | 640 | .55kwx 18x 6.35x 55 |
25/30RT | 770 | .75kwx 18x 6.35x 55 |
40/50RT | 930 | 1.5kwx 20x 6.35x fifty five |
sixty/80RT | 1180 | one.5kwx 20x 8x eighty |
Ab muscles cooling tower enthusiasts are made by adjustable fan angle, adju EPT process is as beneath:
1.Using a wrench, loosen the lock screw
2.Grabbing at the fan heart, rotating blades to the required Angle by an EPT hand (hold an eye on the blades and admirer heart scale)
3.Change the EPT blades to the very same as the fir EPT fan scale
4.Lock screw
Overview
Industrial Geareducers are made and created especially for cooling towers in huge industrial and power plant purposes. In form and operate, their style goes outside of regular requirements- Equally to increase air motion through the tower, and to minimize the affect of upkeep.
Gearbox reducer
Reducer for the second equipment transmission, spiral bevel gear and helical equipment blended transmission program.With compact framework, huge transmission energy, clean procedure, lower sounds and EPT characteristics.The content employed by the equipment is 20CrMnTi, after heat treatment method procedure, to make sure that the equipment has greater wear resistance and impact resistance.The lubrication system adopts the blend of oil immersion and splash flow lubrication. A particular quantity of oil is held in the box. The oil is sent to the oil storage tank by the oil disc to make the oil flow and lubricate the bearing via the stream channel.Skeleton oil seal or mechanical seal is adopted at the entrance of higher-speed shaft. The go over of reducer ought to be removed after 8000 several hours of operation to check the wear of the seal and make a decision whether to replace it.
The lifting ring screw on the lid is for opening the lid of the gearbox when overhauling the gearbox. It can’t be utilized for lifting the gearbox.The manage instrument speak to screw hole is organized on the box entire body, which can be connected to the manage system in accordance to the user’s wants.
Fan overall performance Parameter LF-70
Parameter | Model | LF-70A1 | LF-70Bone | LF-70A2 | LF-70B2 |
Fan Overall performance Parameter | Impeller pace (r/min) | 149 | 149 | 149 | 149 |
Air Quantity*104(mthree/h) | 140 | one hundred forty | one hundred forty | a hundred and forty | |
Entire pressure(Pa) | a hundred and fifty five | 155 | 155 | a hundred and fifty five | |
Blade angle | 12° | 12° | 12° | 12° | |
Blade number | 6 | six | 6 | 6 | |
Blade shaft power(KW) | seventy three | seventy three | seventy three | 73 | |
Force efficiency (%) | 82.6 | 82.six | eighty two.6 | eighty two.6 | |
Fat (Kg) | 2278 | 2278 | 2278 | 2278 | |
Supporting Motor | Model | Y(B)315M1-6 | Y280M-4 | Y(B)315M1-6 | Y280M-4 |
Energy(KW) | ninety | ninety | ninety | ninety | |
Fat(Kg) | 1050 | 630 | 1050 | 630 | |
Install Dimensions | A(mm) | 508 | 457 | 508 | 457 |
B(mm) | 457 | 419 | 457 | 419 | |
C(mm) | 2812 | 2812 | 2989 | 2989 | |
E(mm) | 4190 | 4134 | 4190 | 4134 |
FRQ:
one. Are you manufacturer ?
Answer: Of course we are a cooling tower company located in ZheJiang Province China. With eighteen several years of producing and OEM services for a number of brand of famous cooling tower.
2. Can you provide the cooling tower areas distinct with the specification in below showing sort ?
Reply: We can maker and freshly design and style for special order primarily based on your presented specification and drawing or efficiency demands.
three. What goods are you production?
Reply: cooling towers with its accessories (motor, steel frame, plastic factors, FRP panel, PVC infill, motor, water pump, motor supporter, management box for fan)
four. What is the supply time?
Answer: For round type cooling tower below 300RT, we have stock in warehouse. EPT type cooling tower, want to production upon acquire the PO. Leading time 15 functioning days.
5. What is your quality warranty ?
Reply: 1 year for motor, 2 several years for steel parts, 5 a long time for FRP pannel. Free of charge parts obtainable in the course of gurrantee peorid.
six. How a lot of employees functioning in your manufacturing unit ?
Response: 270 workers at the conclude of 2013.
7. Do you have any creation management system or certification for products.
Solution: ISO 9001:2008 quality and surroundings administration program certificates. CTI member certification for cooling towers.
Loading and shipping
You may possibly be also fascinated in beneath EPT type cooling tower, remember to pay a visit to our site:http:// for more information.
Get in touch with data
The use of first equipment manufacturer’s (OEM) part figures or trademarks , e.g. CASE® and John Deere® are for reference functions only and for indicating product use and compatibility. Our firm and the detailed alternative elements contained herein are not sponsored, approved, or made by the OEM.